    {
    "title": "Extension of deadline for the start of operations of a distribution network - application",
    "uid": "f8653966-dc6f-4879-bb08-78394c5defa2",
    "description": "The electricity distribution concession specifies an adequate time frame of a minimum of six and a maximum of twelve months for the start of operations of the electricity company.",
    "geo": {
        "type": "Feature",
        "geometry": {
            "type": "Point"
        },
        "properties": {}
    }
}